How often should you resurvey container yard pavement?

Most terminals don't have a written answer to this. Pavement gets inspected when something fails, when a lease audit asks for records, or when a new ops manager inherits a yard and wants to know what they're sitting on. That's reactive maintenance, driven by whatever just failed rather than a planned interval.
What drives the interval
Container yard pavement doesn't wear like a public road. The loading is concentrated and repetitive. RTGs and straddle carriers run the same wheel paths thousands of times a month, and the load per wheel is high enough that distress shows up as point failures, cracked joints, spalled corners, isolated punch-through, rather than a slow thinning of the whole surface. A rigid slab under a crane rail sees different stress than the asphalt lanes between reefer rows, and both age differently from the apron where chassis sit loaded for days at a time.
Three things set the real interval for a given yard:
- Traffic intensity. A yard running at or near design capacity with heavy transshipment volumes loads its pavement faster than a feeder terminal with lighter, less frequent moves.
- Pavement type and age. Jointed concrete slabs fail differently than asphalt overlays, and a yard built in phases over twenty years doesn't age uniformly across its own footprint.
- What the last survey found. If the last read showed early-stage joint spalling or corner cracking in a specific block, that block needs a shorter check interval than the rest of the yard, not the same cycle as everywhere else.
Most engineering guidance and PMS vendors land on an annual full-network survey as the baseline for a working terminal, with targeted re-checks on anything already flagged as moderate or worse. Annual is an engineering judgment rather than a regulatory requirement: frequent enough to catch distress progression before a crack becomes a slab replacement, spaced out enough that you're not paying for data that hasn't changed.
Why the interval slips in practice
A proper walking survey means closing blocks, rerouting RTGs, and burning a shift or a weekend that the terminal would rather spend moving boxes. That operational cost, not the budget line, is what pushes the survey off the calendar. A superintendent weighing a known closure cost against an unknown pavement risk will usually defer the survey, and the deferral compounds: by the time the yard gets walked again, two years of load cycles have turned a joint that needed sealant into a slab that needs replacement.
This is also why "annual" so often becomes "whenever we can find a window." The interval that makes engineering sense and the interval that's operationally possible stop matching, and the gap between them is where a program that's annual on paper slips to every thirty months in practice. A yard nominally on a twelve-month cycle but walked every thirty months is carrying eighteen months of undetected crack growth under live crane traffic.
Setting your own cycle
A defensible maintenance cycle starts with a baseline condition survey of the full yard, then repeats at an interval short enough to catch distress progression before it needs anything more than routine maintenance: sealant, patching, joint repair. For most container terminals that's annual for the full footprint, with a shorter check on high-traffic blocks or anything already flagged. Ports with older concrete or known subgrade issues sometimes tighten that to every six to nine months on the worst sections while holding the rest of the yard to the standard annual pass.
The cost of shutting down blocks for a walking crew is the real reason operators skip the survey, so solving that scheduling problem is what makes the annual cycle stick. An overhead pass that reads joint distress and surface degradation across the full yard without a walking crew on the ground lets the survey stop competing with throughput for a slot in the ops schedule. Pavement Survey is built around exactly that: an annual pavement condition read run around live yard operations, so the twelve-month cycle on paper is the cycle you run.
If your yard's last full survey predates your current ops schedule, that's the gap worth closing first.